Foundation: Under Reamed Pile Foundation
Super Structure: R.C.C Framed Structure
Walls: 9" Thick Outside Walls and 4" Thick Inner Walls with Conventional Bricks
Plastering: Cement Plastering in C.M. 1:6 Mix
Doors: Main Door Frame and Shutters are made with Teak Wood with polish and Remaining Doors Frames are Made with Teakwood Flush Doors
Windows: Teakwood Frames, Glazed Shutters are made with Teak Wood with safety grills
Flooring: 6' X 4' Size Marble in drawing dining hall and remaining 2' x 2' size marble flooring
Toilets: Ceramic Tiles flooring with glazed tiles dadoing upto 5' height
Kitchen Platform: Granite Stone on kitchen platform and 3' tiles dadoing for wall and one wash basin in each toilet will be provided
Painting: Two bed rooms & Hall with altek putty with plastic emulsion and remaining with distember outside walls with snowcem
Water Supply: 24 Hours water supply from overhead tank
Electrification: Requesite No.of Points with fixtures with ISI cabling switches
Ward Robes: Cup boards with cement planks will be provided up to 7' Hieght
Plumbing: Concealed P.V.C Plumbing with C.P.V.C Fittings
Lift: 6 Passenger Lift will be provided
Generator: Standby Generator for lift, Motor, Common Lighting and 2 Points for Each Flat
Parking: Car Parking will be provided
Security: intercom Systems for all flats
Solar With Heater: Solar Water Heater connection for Toilet in Master Bed Room
Reverse Osmosis System: One drinking water connection in kitchen
Owners Cost: Charge of stamp duty and registration charges, Service tax, VAT etc at owners cost and any duties or taxes levied by the corporations or any Govt. agencies have to be bornee by the flat owner.
Note: Our Architect may alter the specifications of meterial or elevation for betterment during any stage of construction and his decision is final.
|